Real flights, real outputs.
A growing record of Media4You work — what was captured, how quickly, and what the 3D model recorded.
See the projects Call 07395 322 561Email first if you can — lines are busyWhat was captured, and what the model showed.
Each project below has its 3D model to explore, and the measurements and notes Media4You recorded on it.
Construction · Site inspectionJanuary 2026
A wet construction site, measured and logged in one visit.
Nineteen photographs, captured in under a minute and a half, became a 3D model of the whole site. The piles were measured for volume, and each hazard and job still to do was pinned to its place on the model with a severity rating.
- 19photographs
- 1 min 22 scapture time
- 5,322 m²area covered
- 2.8 millionpoints in the 3D model
Recorded on the model
- Five piles measured for volume, from 10 m³ to 333 m³: the largest a 383 m² pile of mixed dirt and rubble.
- Metal poles left partly underwater where the ground doesn't drain, needing a large vehicle once it dries.
- A damaged trailer stuck in the mud, and a large manhole cover below site level.
- The holding pond full of water, with about 80 m³ of material from it stored on site.
- The site entrance measured at 5.72 m wide.
- Harris fencing and plastic and metal rubbish to clear before work continues.
The dirt store for the temporary holding channel: 932 m², about 268 m³.
Mixed dirt and rubble to remove: 383 m², about 333 m³.
Metal poles partly underwater, pinned on the model with a severity rating.
The site entrance, measured at 5.72 m wide.
Opens the interactive 3D model. Drag to move around; scroll or pinch to zoom.
Agriculture · Field surveySeptember 2026
Drought damage mapped across an 8.8-hectare field.
242 photographs, captured in under five minutes with the DJI Matrice 4T, produced a 3D model, an elevation map and a VARI map of the field. Bare ground, dry spots and dead areas were then pinned on the model and rated by severity.
- 242photographs
- 4 min 36 scapture time
- 8.8 haarea covered (21.8 acres)
- 42.8 millionpoints in the 3D model
Recorded on the model
- A 5,218 m² area of bare ground after the summer drought, where cattle can't graze.
- Eight more dead areas, dry spots and patches of bare ground, each rated by severity.
- A VARI map (a vegetation index from ordinary colour images) showing how the grass varies across the field.
- An elevation map of the ground across the whole survey.
VARI map of the field: green shows more vegetation, red less.
Bare ground after the drought: 5,218 m², measured on the model.
A dead area, pinned on the model and rated by severity.
Elevation map of the surveyed area.
Opens the interactive 3D model. Drag to move around; scroll or pinch to zoom.
Property · Holiday cottageDecember 2024
A holiday cottage, measured from its 3D model.
449 photographs, captured in just over half an hour, built a detailed 3D model of the cottage and its grounds. The wall height, the extension roof, the patio and the driveway were then measured straight from the model.
- 449photographs
- 33 mincapture time
- 1,653 m²area covered
- 11.3 millionpoints in the 3D model
Recorded on the model
- Wall height: 5.05 m.
- Extension roof: 26.5 m², with slopes of up to 44.5°.
- Patio: 34.8 m², 32.6 m around.
- Driveway width: 3.51 m.
The wall height at the gable end, measured on the model: 5.05 m.
The extension roof: 26.5 m², with slopes of up to 44.5°.
The patio, marked out on the model: 34.8 m².
Opens the interactive 3D model. Drag to move around; scroll or pinch to zoom.
Construction · Barn buildNovember 2025
A barn site measured from twelve photographs.
Twelve photographs, captured in under two minutes, gave a measurable 3D model of the plot: the barn's footprint and driveway, the boundary lines, the earth to move, and what else on site would affect the work.
- 12photographs
- 1 min 44 scapture time
- 4,229 m²area covered
- 1.6 millionpoints in the 3D model
Recorded on the model
- Three mounds of excess earth: 109 m³, 162 m³ and 471 m³.
- Building footprint: 391 m², 87.5 m around.
- Driveway: 185 m².
- Boundary lines of 83.3 m and 67.6 m, with 9 m of height change along the longer one.
- A farm trailer and a cultivator noted as temporarily stored on site.
- The neighbouring house flagged at the highest severity: it will be affected by construction noise.
The largest mound of excess earth: 498 m², about 471 m³.
The barn's footprint, marked out on the model: 391 m².
A boundary line measured along the plot: 83.3 m.
The neighbouring house, flagged for construction noise.
Opens the interactive 3D model. Drag to move around; scroll or pinch to zoom.
All figures were measured on each project's 3D model and are rounded.
Have a project like these?
Describe the result, the location and your timing — you don't need to know which drone or file type is right.
Discuss a project Call 07395 322 561Email first if you can — lines are busy